It’s been about a millions years… or feels like it, anyway

Our last post here was a catch-up post that I wrote in early October 2020, and the post didn’t even catch us up to the then current state of progress on our remodel. It’s been forever, and a lot has happened since then. Frankly, one of the things stopping me from updating the blog is pictures. Between us there are many hundreds of photographs to slog through. I’m not going to do it. The photo slogging. Not today, anyway. I’m apologizing up front for the limited number of photos. It’s come down to this: I need to either process all of those (expletive deleted) photographs, or I need to blog without (most of) them.

The other thing is how to organize all of the information and events, and get them all to you in a way that makes sense. I’ve been thinking about it, and I think that if I break things down by month that will be the easiest way to go. We have email messages and Facebook history that I can use for the order of things. Though written in October, my last post caught us up as far as early August last year, with most of the windows being installed, the replacement of the beams in the kitchen ceiling, and graveling the driveway. Next up: the rest of August. Oh, and though I was going to write entire paragraphs for all of this, get Dave to proof it, and any number of other things, I’m not going to. I’m going to leave it as a bullet list, and actually get this update out today! Here goes:

August 2020

  • North-facing kitchen window re-framed for larger glass
  • Window installed

September 2020

  • Removed remains of double sticky tape from lower bath walls
  • Dave continues to take the house apart

October 2020

  • Building starts in earnest: the new laundry room is framed in

November 2020

  • Removed wallpaper border from half bath
  • Copper pipe removed
  • Plumbing rough in done, except for a few things that they returned to do, and a number of things they never did
  • Inspector passes the plumbing… why?

December 2020

  • Electrical rough in starts December 9, and turns into a much larger job than originally planned, as the original wiring in parts of the house were so weirdly done, and so far away from code that it’s amazing the house didn’t burn down decades ago

January 2021

  • Electrical rough in passes inspection—hooray!
  • Maple tree near house removed, so very very sad, but it had to come out as a significant percentage of the trunk was hollow

February 2021

  • We realize that the plumbers didn’t do more things than we’d thought… like they missed plumbing the shower in the downstairs bathroom, and the ice maker in the kitchen has no water, and a large list of other things; if you’re local and want to know which plumber to avoid, we’ll be happy to tell you

March 2021

  • Heavy rain shows that the fix to the laundry room wall isn’t 100%
  • Network closet floor installed, and it’s gorgeous; that same floor will be installed throughout the house, except in bathrooms and laundry room

April 2021

  • Roll up garage door installed in barn
  • Fixed laundry room back wall leak problem but good; work done by Rock Solid Waterproofing

May 2021

  • Dave begins pulling network wiring throughout the house
  • Master bath linen closet delivery
  • Removed remaining insulation from entire house
  • Same guy who laid the floor in the network closet also fixed the two toilets that the journeyman plumber didn’t know how to deal with (there are no words for that original plumber that make him sound good)
  • New plumber found to fix original plumber’s mistakes, then he leaves for a three-week vacation so work is put off until mid June
  • Rose hedge falls over
  • Insulation hung upstairs

June 2021, so far

  • Insulation hung thought most of the downstairs
  • Insulation inspection passed for upstairs; downstairs pending
  • Finally finished painting the master bathroom; painting the half bath begins
  • Sheet rock going up!
  • Climbing rose put on trellis
  • Work cutting fallen roses back begins; this is going to take me a while (there are 17 bushes in the hedge!); the worst of the fallen have been cut back, and the remaining canes look great

And now you have read the list, and we are all caught up. Basically. I don’t even want to tell you when we think we might be able to move into our house, as I don’t want to jinx it. Stay tuned. I’ll leave you with this photo of Ansel. He is extremely good at being cute.

Removing Some Paneling and More Board and Batten

Started removing some of the paneling up stairs.

This stuff is actually rather hard to remove. First off, it’s pretty high-quality. The panels overlap at the seams instead of simply butting up against each other. That means that you have to take them off in the right order (i.e., you have to remove the top panel first).

 

In addition to that, they used 2″ nails with heads instead of panel nails in most places. That makes it really hard to get them to pop. Most of them are pulling through.

 

I also removed most of the remaining board and batten in my office.

 

That’s a lot of wood!

Indoor board and batten begins to come down

Monday

On Monday we decided it was “sweep the barn day.” So, we swept the barn. Dave worked on the loft while I swept downstairs. The weather was perfect for manual labor. Well before we were done we were both down to our shirtsleeves, even though it was in the low 50s out there, and the barn doors were wide open.

Dave started by stacking the bales of straw. There are nine of them. The straw and hay ladder will be going to friends who have horses.

I created this pile of, er, sweepings, by attacking this one corner with my broom. I wonder how long it’s been since the barn’s been swept. I’m thinking it’d been quite a while.

More progress! I still have to get in under the sink, behind the wood stoves, and behind the huge air compressor. The easy stuff, the middle of the room, is done now, though. To be Ansel-safe, though, the icky parts in the corners need to be cleaned up, too. No telling what’s back there. I’m sure it’s stuff we don’t want our little boy getting into, whatever it is. Ick.

Tuesday

Dave went up to the house without me, so that I could get some stuff done at my desk for a change. You know, the fun things, like paying bills, balancing checkbooks, and the like. He worked between appointments there. The locksmith came by and changed the lock on the mailbox (the tenant forgot to leave the key for us), the insurance company’s photographer swung by to take some photos, the pest guy came by to say he couldn’t treat for the beetles we have as his truck with that equipment on it needs fixing, but while he was there he treated for carpenter ants and the wasps that we found in the wall a few days before, and… I forget what else happened. I know I’m forgetting someone.

His tasks for the day started with getting up the last of the linoleum from the floor in his office. Well, as much as he could. There’s this one area that’s stuck pretty good. Neither the floor scraper nor the crowbar will lift it. Suggestions, anyone?

We’re hoping that the linoleum in the TV room and downstairs guest room don’t need to be pulled before hardwood goes down, so Dave finished cleaning the carpet pad off the TV room floor as best he could. Those yellow bits are resisting, but super thin. Here’s hoping.

The walls in Dave’s office and the library are board and batten where there’s no brick. Rough cut planks. I don’t know for sure if they are leftovers from the exterior of the house, but to me they look like they might be. Dave might disagree. I don’t think I’ve thought to bring up the topic when he’s been around. Either way, though this is a picture of the outside of the house, and the boards have been painted, this is a good example of what the indoor walls look like, too. This is also shows how lovely (cough) the house looks with more of those white plastic shutters removed.

Next he attacked the walls downstairs. He left walls alone that have switches or outlets or anything else electrical for another day, as we want Ansel to be safe when he comes to visit.

Dave’s wall before

Dave’s wall after

You may have noticed the insulation on the wall. That’s an interior wall. The other side of that wall is the TV room. There’s no insulation on exterior walls in this room, so he left the paneling on those walls for now. What with winter coming on, it could get cold in there with nothing between you and the weather but one layer of 40-year-old cedar exterior siding. Brr.

Dave worked on the library walls a bit, too, again leaving panels where electrical wires could get tangled in Ansel’s sweet little paws.

Wondering what was surprising? Dave found four of these sad little mouse carcasses when he was taking the walls down.

The demolition begins

Dave and I spent about five hours over at our house (that sounds so strange!) yesterday. Mostly we ripped out the carpeting in the TV room and the guest room downstairs. We (meaning Dave) also got started ripping out the carpet in his office, but let’s back up a tiny bit. We also narrowly avoided (especially Dave) getting stung by a bunch of startled wasps.

When we closed escrow we only received two keys, the only two keys that the seller had, both unlocking all exterior doors around the house. The mailbox key? The garage door remotes? Gone. Kept by the last tenants, apparently. Arg. To help keep all and sundry out of our new house, we bought a couple new deadbolts. Dave installed the second one when we got there yesterday. To keep myself busy while he was swapping out the deadbolt on the kitchen door, I took a screwdriver and removed switch plate covers around the living room and dining room, avoiding anything that didn’t use a standard screwdriver. When he was done with the lock, Dave attacked one of the places where cable comes into the house in the living room. Then, suddenly, he was backing up fast, batting at his hair, and making strange noises. You’d be making strange noises, and flailing around, too, if you were suddenly attacked by a bunch of wasps.

Here he’s calmed down a bit, but mostly because he had a can of “instant death” in hand to help fight off the swarm.

We opened up what windows we could (the front windows are glued shut), the door, anything to try to encourage the mean-spirited wee beasties to beat a hasty retreat. (A couple hours later, when all but one were dead or departed, I used the included fireplace tools to sweep up the carcasses, and dump them outside. I also pushed the cover back over the hole the wasps emerged from, to encourage them to stay put.) Later on we found where they’re entering the house. We’ll deal with that another day.

We’d thought to maybe start pulling up the rugs upstairs first off, but decided to begin downstairs. Just in case.

We started with the old mottled brown carpet in the TV room. It matches, sort of, the carpet on the stairs and upper hallway. Really terrifying stuff. We started pulling it up, and were surprised by what we found. No tack strips. No padding layer. Nope. Here we had a thin layer of padding stuff that was stuck to the bottom of the carpet… and to the classic brown linoleum floor below.

And here we were thinking that the carpet was horrible because it was original to the house. Nope. Turns out it’s horrible, because it’s horrible.

(P.S. Everyone wants a water heater in their TV room closet, right?)

Well, that was fun. Yes, we left a bunch of the pad on the floor for later. We moved on to the downstairs guest room.

This is what we were expecting. Tack strip. Pad. Yeah, that’s the ticket.

Wait a second, though. Yes, that’s right. They installed the built-in bookcase over the carpet. Oy.

What’s underneath? More brown linoleum, like in the TV room.

Next surprise: they glued the tack strip to the old linoleum floor.

What we both found interesting is that this room looks bigger without the light colored carpet. Must be the shine on the linoleum.

Moving on to Dave’s office we (well, Dave) pulls off the baseboards in preparation.

These walls are horrible. They’ve been a source of frustration for people for quite a while. So far, in pulling out the baseboards and carpeting in Dave’s office we’ve gotten rich, found one red die, and a little plastic toy thing. I wonder what else we’ll find.

In this room, the thin dark brown carpeting is stuck so well to the linoleum that it’s easier to pull up the linoleum than to pull the carpet off of it. So that’s what’s happening here. Strip by painful strip. These things weigh a ton. Dave’s currently wishing he was about 20 years younger. Maybe more. Ouch.

You know what, though? The room already looks tons bigger. Looking forward to getting the rough-cut paneling off the walls in here, too, but that will have to wait until another day.